MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
January 29, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on January 29, 2007 at 6:00 PM at 350 Bleecker Street, New York, New York. Present were Bob Coviello, Maura Geils, Laura Heidenry, Robinson Holloway, Carlene Jackson, Jim Kafadar, Sue Kobin, Richard Mavity, Stephanie Phelan and Armanda Squadrilli. Notice of the meeting was waived by all present. The votes below were decided by consensus.

1. Window decals need to be ordered. "350 Bleecker" plus a daisy design will
   be done in a san-serif typeface.  Stephanie Phelan will email a .pdf file
   for review by the committee [Done].


2. Doors will be stained and satin-finished.  Armanda Squadrilli to distribute
   stain samples.

3. Remove the mirror to the south of the elevators. [DONE]

4. The closet doors will not have handles.

5. Richard Mavity will pass on the lobby desk design for an estimate.  He will
   get hallway carpet samples.

6. Light outside (under awning) to match interior can/florescents.  
   The exterior light be aligned with the interior can/florecents.
   The stray halogen lamp (just southwest of the ramp) will be buried.

7. Next design committee meeting date to be decided via email.

8. Furniture choices to be decided by majority vote after a field trip
   to North Carolina.  Other decisions to be made this way if possible.
   
9. Remove drop ceiling from a/c and redesign it to be flush with beams.

/s/ James D. Kafadar
James D. Kafadar, Secretary

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
March 23, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on March 23, 2007 at 6:30 PM at 350 Bleecker Street, New York, New York. Present were Robert Coviello, chairing the meeting, Sue Kobin, and Armanda Squadrilli.

1) Railing alongside the ramp
   - a railing will be installed as soon as possible.
   - the material will be either stainless steel or chrome
   - there will be no glass
   Vote: Unanimous

2) Plants
   The plants will be removed as soon as the railing is installed and there
   won't be plants in the lobby. 
   Vote: Unanimous

3) Cherrywood console
   This console will be removed. There will, however, be a console in the 
   lobby for the flowers, location and material to be decided.
   Vote: Unanimous

4) Furniture backing up against ramp
   There will be no furniture against the ramp.
   Vote: Unanimous.

5) Permanent station
   There will be a permanent station as detailed in the Sterling plan.
   Vote: Unanimous

6) Closet door stain
   These doors will match the station. Both doors and station will be stained
   and finished to match, but the actual color and finish will be determined at
   a later date.
   Vote: Unanimous

7) Walls
   - the left wall of the lobby will be covered in the Nexus 6425 W407
     silver/grey-sheen, textured material
   - the right wall of the lobby (by the ramp) will be painted off-white
   Vote: Unanimous

8) Furniture
   Plan A: Sue will follow up with Roche-Bobois regarding their decorating and
   providing the lobby furniture, with credit to their company, terms and 
   time-frame to be negotiated.

   Plan B: If we don't go with the Roche-Bobois plan, the choice is for
   4 Fabien Baron chairs, model 6903 B.3, in black or charcoal grey
   Vote: Unanimous

9) Rugs
   There will be no rugs in the lobby (except of course the rain rugs when it's wet outside)
   Vote: Unanimous

10) Next meeting
    The next Design Committee meeting will be on Friday, April 20th, 6.30 pm,
    in the gym, unless otherwise announced.

The meeting was adjourned at 7:20 pm.

via email
Armanda Squadrilli, Acting Secretary

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
April 20, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on April 20, 2007 at 6:30 PM at 350 Bleecker Street, New York, New York. Present were Robert Coviello, chairing the meeting, Maura Geils, Sue Kobin, and Armanda Squadrilli.

1) Railing alongside the ramp
Maura will spearhead this happening as soon as possible. 
Agreed that it be stainless steel.

2) Plants
Agreed that removal is subsequent to railing installation

3) Console for flowers
Agreed to replace previous console with temporary stand for flowers, 
in same spot. Squad will organize.

4) Permanent station 
Maura following up to move this ahead.

5) Closet door stain
Discussion on the actual color and stain (which will match the permanent
station) tabled until permanent station is finalized.

6) Furniture
UPDATE From Sue as to Plan A or Plan B, see below.
Plan A: Roche-Bobois. Sue met with R-B and within two weeks, 
they will have a plan for us to approve. Sue will follow up.

Reminder of Plan B: if we don't go with the Roche-Bobois plan, or after the
R-B plan is over, the decision was made in favor of 4 Fabien Baron chairs,
model 6903 B.3, in black or charcoal grey, decided upon at previous design
committee meeting, unanimous.

7) Hallways
Discussion on proposal to have each floor organize and design their own
décor, based on parameters determined by the coop board. Committee decided
to go for a uniform look - 2 in favor, 1 against, 1 abstention.

8) Next meeting scheduled for May 16th, at 6:30 pm in gym.

9) Adjournment.

via email
Armanda Squadrilli, Acting Secretary

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
May 16, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on May 16, 2007 at 6:30 PM at 350 Bleecker Street, New York, New York. Present were Robert Coviello, Maura Geils, Lauren Heidenry, Robinson Holloway, Jim Kafadar and Sue Kobin.

1) The lobby desk was agreed upon with the provision of a frosted glass top 
   held by stainless pegs or a stainless inset channel.

   The glass should be frosted on one side. Maura Geils is communicating with
   Falcon Perspective to get wood    samples, a revised rendering showing the
   glass and the railing proposal.    The railing will match the door handles 
   on the lobby entrance doors.

2) The wall covering that was voted upon in March will be installed on the south
   wall of the lobby. Rob Geils will show it to all board members in order to
   get input and proceed with installation rather than wait until the next board
   meeting in June.

3) Sue Kobin is working with Roche Bobois to see if they will do a furniture 
   installation in our lobby. If not, we will proceed with the ordering of the
   Fabien Baron B3 chairs that were voted upon in March's meeting.

4) Hallway ideas were discussed and one idea was proposed by Robinson Holloway.
   All members are welcome to bring forth visual content sample choices that can
   then be presented to the design committee and the board of directors for 
   approval. Being a large, costly, and time consuming job, it is being proposed
   to do it in stages, i.e. a few floors at a time.

5) Lighting was discussed. Jim Kafadar is working on finding out what type of 
   electrical current our hallways can handle in order to determine new lighting
   fixtures in the hallways. Moving Time Warner molding higher with an uplight
   behind it was discussed as were drywall over the faux brick next to the 
   elevators. Sconces were suggested next to the elevators also.

The meeting was adjourned approximately 7:20 PM.

Our next design meeting is scheduled for June 6th at 7:00 p.m. in the gym.

via email
Maura Geils, Acting Secretary

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
June 6, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on June 6, 2007 at 7:00 PM at 350 Bleecker Street, New York, New York. Present were Maura Geils, Laura Heidenry, Robinson Holloway, Jim Kafadar and Sue Kobin. Notice of the meeting was waived by all present.

1. Doorman's Desk.  A glass partition was added and will be sent to Falcon Perspectives. 


2. Roche Bobois still has not responded to an on-site visit.

3. The general plan is to start the hallway renovations with lighting first --
   followed by molding which will hide the Time-Warner cables as well as rope
   lighting to provide accent light.

4. A tentative color scheme for the hallways was discussed:
   black and white and red -- ivory walls, salt and pepper carpeting, and either
   black or red doors. It was decided to paint two doors in the basement -- 
   one black, one red -- to determine which color looked best.
   Black and white murals were discussed as art for the area around the elevators.


5. Hallway design will be tested in small hallway in front of the 1E apartment.
   The sample florescent light and rope will be installed before the next meeting
   Carpet samples will be available with Maura Geils after June 14, 2007.

6. Next meeting is scheduled for Monday, June 25 at 7:00 PM.

via email
Robinson Holloway, Acting Secretary

 

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
July 9, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on July 9, 2007 at 7:00 PM at 350 Bleecker Street, New York, New York. Present were Robert Coviello, Maura Geils, Lauren Heidenry, Robinson Holloway, Jim Kafadar, Sue Kobin and Randy Sell.

1. Lobby Console - Maura Geils received final renderings from Falcon 
  Perspectives which was posted on our website. All finishes are indicated on 
  the renderings. Maura Geils has samples of the granite and glass.  The 
  renderings will be posted in the lobby's bulletin board by Jim Kafadar.

  The glass will be frosted on one side. Maura Geils is communicating with
  Falcon Perspectives to get wood samples, a revised rendering showing the
  glass and the railing proposal. The railing will match the door handles
  on the lobby entrance doors.

2. The committee has decided to pass on sconces for the walls and perhaps
   consider doing one on each side of the elevator with a mirror accent.
   The Light Disc from Luce Plan was unanimously approved for the overhead
   hallway light. Two samples of the Light Disc fixture will be installed
   near apartment 1E.

3. Hallway carpeting was discussed. Randy Sell and Robinson Holloway will
   present two different color schemes: "blue camp" and "red/cerise camp." 
   The committee will review the schemes before choosing a carpeting color.
   Sample #595 from Aaronson's was the favorite carpet in the "blue camp."

4. Bricks in the near the elevators will be either demolished or covered with
   sheet-rock.

5. Elevator damage was discussed, i.e. handrail being stainless rather than
   black, the floor tile was discussed and suggestions came up to redo or 
   cover with carpet.

The next design meeting is scheduled for August 16th at 7:00 p.m. in apartment 6E.

via email
Maura Geils, Acting Secretary

 

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
December 17, 2007

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on December 17, 2007 at 6:30 PM at 350 Bleecker Street, New York, New York. Present were Maura Geils (by phone), Sue Kobin, Lauren Heidenry, Robinson Holloway, Linda Schloss and Randy Sell. Notice of the meeting was waived by all present. The votes below were decided by consensus.

1.  Meetings will now meet the third Wednesday of every month, at 7:00 PM, in
    apartment 6E. The next meeting will be held on January 16, 2007.

2.  Officers of the Design Committee: President: Maura Geils, 
    Secretary: Sue Kobin, Board Liaison: Jim Kafadar

3.  An interior designer is needed. At the next meeting, please bring names of
    potential designers.

4.  The board needs to approve a budget for the committee.

5.  Lobby is next design priority. Please bring lobby ideas and samples or
    illustrations to next meeting.

6.  The lobby carpet has not been decided.

7.  All prior votes are null and void.

8.  Future votes will be final, but only with attendance of over 50% of the
    committee. The next meeting will finalize the members on the committee.
    As of January 16th, if you miss 3 meetings in a row -- you will be
    ineligible  to serve on the committee for one year.

9.  Meetings to be kept to 1 hour.

via email
Sue Kobin, Design Committee Secretary

 

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
January 16, 2008

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on January 16, 2008 at 6:30 PM at 350 Bleecker Street, New York, New York. Present were Maura Geils, Lauren Heidenry, Robinson Holloway, Sue Kobin, Linda Schloss and Randy Sell. The votes below were decided by consensus.

1. The committee met at Room & Board, a furniture store on Wooster Street,
   and selected a chair for the lobby -- see website for style and
   fabric.  They decided to recommend the purchase of 4 chairs for the
   lobby as well as an 8' x 11' carpet to coordinate with the chairs. 

2. A low table, a console table and a mirror will be selected at a later
   date. It was recommended that the current lobby furniture be donated
   to the teacher's lounge of P.S. 184.

3. The committee then returned to 350 Bleecker to test samples in the
   lobby before making the final decision on the fabric and carpet. The
   committee also decided that the lobby wall color should be white.

4. The committee also agreed to a test hallway using one of the
   gray/cream carpets from Durkan that were inspired by the carpet that
   impressed the Board at the Perry Street Cafe. The test hallway color
   will be a pale off-white and the test doors either black or dark gray.

5.  The next meeting of the design committee is scheduled for Wednesday, February 13.

via email
Robinson Holloway, Design Committee Secretary

 

MINUTES OF THE MEETING OF THE DESIGN COMMITTEE
350 BLEECKER STREET APARTMENT CORP.
February 13, 2008

A meeting of the Design Committee of 350 Bleecker Street Apartment Corp. was held on February 13, 2008 at 6:30 PM at 350 Bleecker Street, New York, New York. Present were Maura Geils, Lauren Heidenry, Robinson Holloway, Linda Schloss and Jim Kafadar. The votes below were decided by consensus.

1. The lobby four chairs and carpet from Room & Board that the committee
   selected at the January meeting have been ordered and will be
   delivered in March.  The committee still needs to find a coffee table
   and a console table for the lobby. Members were asked to look for
   samples to present at the next meeting.  The lobby walls will be painted
   in March after the installation of additional lighting to highlight the 
   lobby art, and after the wood used to secure the art is buried in the wall.
   A flat, wall mounted radiator will also be installed in the lobby.
   The next art installation will be on March 1st.

2. There are two test hallways planned, one in the area outside 1E/1F and
   the other outside 4E/4F. The first test hallway will have a gray and cream 
   carpet and wall and door colors selected by the Board (pictures of carpet 
   samples currently in the case outside the mailroom). The other hallway will 
   have a carpet and color scheme selected by the Design Committee. At the 
   February meeting the committee unanimously decided on a bold carpet pattern
   (see http://www.350bleecker.com/design/hallway.html. Jim will
   make arrangements with Durkan to get carpet samples and prepare the
   test hallways in the next few weeks.
   
3. The building is currently soliciting bids from contractors to put up
   the molding in the hallways.

4. The next meeting of the design committee is scheduled for Wednesday, March 12, 6:45 PM.

5. REMINDER: It was determined at the December 17, 2007 meeting that anyone who
   misses three Design Committee meetings in a row would not be part of the 
   committee for the rest of the year - they will be allowed to rejoin in 2009.
   Anyone who did not attend the January and February meetings who misses the 
   March 12 meeting will no longer be part of the Design Committee for 2008.

via email
Robinson Holloway, Design Committee Secretary

 

 

DRAFT AGENDA FOR NEXT MEETING
350 BLEECKER STREET APARTMENT CORP. APT. 6E
March 12, 2008 6:45 PM

1. Approval of Design Committee minutes of 02/13/08.

2. Lobby Furniture installation

3. Lobby Table and Console Suggestions

4. Old business

E-mail the Jim to add item to agenda

 